MISys Manufacturing – Use ‘Purchasing Advice’ and ‘Production Advice’ to review What-If Simulations.

When building a Materials Management strategy from a forecast, a great way to view the output of MRP simulations is by running ‘Purchasing Advice’ and ‘Production Advice’. Enter the Master Production Schedule number for each simulated MPS run as shown below and run the report.

The report outputs can be configured in many ways. To include currently scheduled replenishment along with the calculated replenishment Select ‘Existing Orders’ in the interface (example: purchase order P48 below). The report lists the calculated replenishment Qty for each item, time phased for the duration of the forecast simulation.

 
 

An example of the Purchasing Advice Report:

 
 

Need more? Give us a call.

Matt.

Previous
Previous

MISys Manufacturing – How to Quickly Edit a Bill of Manufacturing

Next
Next

Looking up serial or lot information in MISys